Jiangsu Bosiwei Optoelectronics Group Co.,ltd

News

Home > News > Gantry

Gantry

2021-03-03

Gantry is a new type of small lifting gantry developed in accordance with the daily production needs of small and medium-sized factories (companies) for handling equipment, warehouses importing and exporting, lifting and repairing heavy equipment and material transportation. It is suitable for manufacturing molds, auto repair factories, mines, civil construction sites and occasions where lifting is required. Commonly used in building construction, it is also used as material transportation and construction personnel to use up and down to realize hoisting machinery. It can reduce manpower, reduce production and operation costs, and improve work efficiency.
advantage:
The biggest advantage of the mobile gantry is that it can be moved in all directions, can be quickly disassembled and installed, and has a small footprint. It can be transferred to another site for installation and use with a miniature car. The width and height can be adjusted in stages, and the steel structure is reasonably designed, which can bear the weight from 100 to 5000 kg. Especially suitable for the installation, handling and debugging of workshop equipment. Loading and unloading of cargo on cars, hoisting large engine parts in auto repair workshops, etc.
specification:
There are two main specifications for small lifting gantry: one is the gantry that moves on the ground in all directions, with brake bearing wheels that can move on the ground, and is suitable for lifting objects on the ground; the other is to use steel rails to be fixed on the floor or On the beam, hoisting is realized by electric or manual hoist. It can reduce manpower, reduce production and operation costs, and improve work efficiency.
characteristic
1. Equipped with self-lifting device, erection and disassembly can be completed independently by the working mechanism set by itself. The height increases as the building rises. The erection is labor-saving and low-cost.
2. Adopting the attachment rod to attach, no need to hold the wind rope, which improves the construction conditions.
3. When erecting and disassembling, there are always two uprights connected into one body, and the work is rated as stable, safe and reliable.
4. The manual hoist hoist self-lifting platform is adopted, and the standard section is installed with a squeegee, so the labor intensity is low.
5. The rope-breaking safety protection device is adopted. Once the rope is broken for some reason, the pallets set on both sides of the gondola will jam the gondola in the air and prevent the accident of the gondola falling to the ground.
Operating procedures:
1. After the gantry operation (assembly) is completed, a load test hoist should be carried out; the test hoist is divided into static load and dynamic load, and the operation capacity, carrying capacity, stability and reliability of each system are checked.
2. When the gantry is running, it must be parallel and stable without twisting it.
3. Overload use is strictly prohibited.
4. There should be a dedicated person for unified command during operation, and other personnel should have a clear division of labor; determine a unified contact signal.
5. In the event of a power outage or other special circumstances during operation, heavy objects should be dropped to the ground and not suspended in the air.
6. It is strictly forbidden to stand under the gantry and lifting heavy objects.
7. It is forbidden to stand on the gantry when it is running.
8. The erection and use of gantry and derrick must meet the requirements of the industry standard "Safety Technical Code for Gantry and Derrick Material Hoist" (JGG88-2010).
① The distance between the vertical rod and the longitudinal horizontal rod shall not be greater than 1m. The bottom end of the vertical rod shall be placed with an iron pier, and the backing plate shall be tamped.
② Scissors should be erected on the outer sides of the derrick all the way to the top, and the angle between the scissor struts and the ground is 60°.
③ The spacing of the horizontal horizontal rods of the platform shall not be greater than 1m. The scaffold must be laid flat and tightly. Double horizontal horizontal rods shall be used when overlapping the ends. The ends of the plates shall exceed the horizontal horizontal rods by 15cm during overlap. Each layer of the platform shall be equipped with a protective body. Bars and toe boards.
④ The two poles should be connected with butt fasteners, and the cross points must be connected with fasteners, and they must not be tied.
⑤ The sky-wheel frame must be erected with double sky-wheel woods, and piled steel pipes or eight-shaped poles should be added and fastened with fasteners.
⑥ Assemble the triangular column gantry, and weld flanges at both ends of each column. When assembling the tripod frame, it is necessary to check that the welded joints of each component are firm, and the bolts of each node must be tightened.
⑦ The two triangular uprights should be connected to the ground beam. The bottom of the ground beam should have anchor iron and be buried in the ground to prevent sliding. When the ground beam is buried, the foundation should be flat and compacted.
⑧ At the entrance of each floor, an unloading bridge platform should be erected, two guardrails should be erected on both sides of the bridge platform, and a dense mesh safety net should be erected, and a horoscope should be erected at the lower entrance of the bridge platform.
⑨ Derrick and triangular column gantry are strictly prohibited from contacting electrical equipment, and reliable insulation protection measures should be provided. When the height is above 15m, there should be lightning protection equipment.
⑩ The derrick and gantry must be equipped with safety protection devices such as ultra-high limit, broken rope insurance, mechanical, manual or interlock positioning brackets.
⑪ 1 set of cable wind ropes should be installed at the height of l0~l5m, and 1 group shall be added for every 10m increase, 4 in each group. The cable wind rope shall be used with steel wire ropes with a diameter of not less than 12.5mm. Ground anchors shall be buried in accordance with the regulations. On objects such as trees, telephone poles, and components. It is also forbidden to use other bars to adjust the length of the wire rope.
⑫ A safety shelter with a length of not less than 2m should be set up on one side of the feed inlet of the gantry and the first layer of the derrick, and sealing measures must be taken on the other three sides. Safety gates must be installed at each level of unloading platform and the entrance and exit of the cage (pan), and no people are allowed to ride in the cage (pan) during operation.
⑬ The guide pulleys of the gantry and derrick must be individually anchored firmly, and the wire ropes from the guide pulley to the drum of the winder shall be shielded at all passages.
⑭ The vertical distance between the sky wheel and the loading platform of the highest floor should not be less than 6m, so that the vertical distance between the highest position of the lifting cage (pan) and the sky wheel should not be less than 2m.
Traffic gantry
Traffic gantry is a kind of door-frame type shelf used for road traffic. Its two columns are like coiled dragon columns and used for road traffic, so the image is called traffic gantry.
The types of traffic gantry can be divided into: traffic speed limit gantry, traffic monitoring gantry, road Traffic Sign gantry, LED guidance screen traffic gantry.

The basic function of the traffic gantry is to limit the maximum height of vehicle traffic to ensure the safety of traffic. According to the different conditions and functions of the traffic gantry, different functions can be added on the basis of the function of height limitation to play more roles. For example: speed limit and height limit, height limit guidance, height limit monitoring, and height limit traffic information promotion.

12

Send Inquiry

Anny

Ms. Anny

Email:

Send Inquiry

Tel:86-514-84230418

Fax:86-514-84238418

Mobile Phone:+8618852753718Contact me with Whatsapp

Email:

Address:Lingtang industry park,China,Gaoyou city, Yangzhou, Jiangsu

Mobile Site

Home

Product

Whatsapp

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send